FY25 Local Bottleneck Reduction
Sector: Water Supply and Storage • Location: Hyannis, Massachusetts, United States of America
Source: Dodge
Furnishing and installing new traffic signal control cabinets, traffic signal poles, mast arms, traffic signals, traffic signal detection equipment, traffic signal coordination equipment, and pedestrian signals. Constructing cement concrete pedestrian curb ramps, bump-outs, median islands and installation of detectable warning panels. Installing and connecting new drainage structures to existing d
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Cement, Road, Car parking, Automotive, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Hyannis, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FY25 Local Bottleneck Reduction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnishing and installing new traffic signal control cabinets, traffic signal poles, mast arms, traffic signals, traffic signal detection equipment, traffic signal coordination equipment, and pedestrian signals. Constructing cement concrete pedestrian curb ramps, bump-outs, median islands and installation of detectable warning panels. Installing and connecting new drainage structures to existing drainage system. Mill and overlay, and full depth pavement reconstruction. Installing signs and pa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyannis |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Road, Car parking, Automotive, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
