logo
ProjectBidding

FY25 Pump Maintenance & Electrical Upgrades

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project generally includes the removal, inspection, rehabilitation and/or replacement of pumping equipment at one (1) potable water groundwater well facility and six (6) irrigation pump stations, ancillary equipment improvements at on (1) additional irrigation pump station, and electrical equipment upgrades at two (2) additional irrigation pump stations as described in the Contract Documents.

Status
Prospective
Sector
Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial), Waste Processing and Treatment
Location
Nampa, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FY25 Pump Maintenance & Electrical Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY25 Pump Maintenance & Electrical Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Nampa, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project generally includes the removal, inspection, rehabilitation and/or replacement of pumping equipment at one (1) potable water groundwater well facility and six (6) irrigation pump stations, ancillary equipment improvements at on (1) additional irrigation pump station, and electrical equipment upgrades at two (2) additional irrigation pump stations as described in the Contract Documents.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Nampa

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project