FY25 Small Arms Storage Facility
Sector: Raw Materials • Location: Albuquerque, New Mexico, United States of America
Source: Dodge
THE PROJECT consists of construction of a facility for hazard class 1.3 and 1.4 munitions storage at 377th Maintenance Squadron (377 MXS) Munitions Storage Area (MSA). Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense anti-terrorism/force protection requirements per
- Status
- Prospective
- Sector
- Raw Materials, Warehouse, Commercial, Consumer Products, Aerospace & Defense
- Location
- Albuquerque, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FY25 Small Arms Storage Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding, Construction Documents |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | THE PROJECT consists of construction of a facility for hazard class 1.3 and 1.4 munitions storage at 377th Maintenance Squadron (377 MXS) Munitions Storage Area (MSA). Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense anti-terrorism/force protection requirements per Unified Facilities Criteria 4-010-01. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Albuquerque |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Warehouse, Commercial, Consumer Products, Aerospace & Defense |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
