logo
ProjectBidding

FY25 State Military Reservation Loading Dock Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Construction of a new multi-level, stand alone, concrete loading dock as well as the removal of an existing temporary loading dock [wood & gravel construction] at The State Military Reservation [SMR], Virginia Beach, VA. The work can be generally described as site clearing, excavation, concrete footings, formwork, steel reinforcing, site grading and selective demolition located at SMR Virginia Bea

Status
Prospective
Sector
Manufacturing (Industrial), Cement, Steel, Metal, Commercial
Location
Virginia Beach, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about FY25 State Military Reservation Loading Dock Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FY25 State Military Reservation Loading Dock Replacement” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Virginia Beach, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a new multi-level, stand alone, concrete loading dock as well as the removal of an existing temporary loading dock [wood & gravel construction] at The State Military Reservation [SMR], Virginia Beach, VA. The work can be generally described as site clearing, excavation, concrete footings, formwork, steel reinforcing, site grading and selective demolition located at SMR Virginia Beach Virginia.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Virginia Beach

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Cement, Steel, Metal, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project