FY26 Sewer and Manhole Lining Improvement Project
Sector: Airport • Location: Torrington, Wyoming, United States
Source: Torrington Telegram
Lining approximately 14,071 lineal feet of eight-inch cure-in-place pipe, 307 lateral reinstatements, and 441.63 vertical feet of manhole protective coating to address erosion and H2S damage in sewer manholes along the prison corridor and Vistas area.
- Status
- Closed
- Sector
- Airport, Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Torrington, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Torrington Telegram
ConstructChat
Ask ConstructChat about FY26 Sewer and Manhole Lining Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lining approximately 14,071 lineal feet of eight-inch cure-in-place pipe, 307 lateral reinstatements, and 441.63 vertical feet of manhole protective coating to address erosion and H2S damage in sewer manholes along the prison corridor and Vistas area. |
Original sector | Water and Wastewater |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Torrington |
Source
Source | Torrington Telegram |
URL |
More Details
Record type | Project |
Sector | Airport, Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
