FY27 Sewer Tax Rate Hearing and Sewer Connection Requests
Sector: Waste Processing and Treatment • Location: Fairfield, Connecticut, USA
Source: Patch
The Fairfield Water Pollution Control Authority is scheduled to discuss the timeline for the Fiscal Year 2027 Sewer Tax Rate Hearing, with proposed sewer tax rates to be presented and discussed during the board's August 19 meeting and final rates to be adopted before September 4. The authority will also review several sewer connection requests for proposed residential developments at 110 Woodrow A
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Residential
- Location
- Fairfield, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about FY27 Sewer Tax Rate Hearing and Sewer Connection Requests
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Fairfield Water Pollution Control Authority is scheduled to discuss the timeline for the Fiscal Year 2027 Sewer Tax Rate Hearing, with proposed sewer tax rates to be presented and discussed during the board's August 19 meeting and final rates to be adopted before September 4. The authority will also review several sewer connection requests for proposed residential developments at 110 Woodrow Ave, 525 Tunxis Hill Road, and 1 and 59 Post Road. |
Original sector | Water and Wastewater |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Fairfield |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Residential |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in USA
- Widen Turnpike Mainline SR 91 from WPB Service Plaza to Okeechobee Blvd SR 704
- Widen Turnpike from Southern Blvd to Okeechobee Blvd
- Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd
- Dow-Mitsui Chlorine Manufacturing Facility Project
- Stromberg Development Tract Mixed-Use Project
- Storm Drain Trash Capture Installation on Holmes Street
- Conrads Lane improvements
- Route 70 Project in Cherry Hill, South Jersey
