logo

G1816 Wuhai-Maqin Expressway Cooperation to Saierlong (Ganqingjie) section

Sector: Road • Location: China

Source: World Bank Group

Project
Active

The project involves the construction of the G1816 Wuhai-Maqin Expressway Cooperation to Saierlong (Ganqingjie) section, located in Gannan Prefecture, Gansu Province, China. The two-way four-lane expressway has a total length of 102.767 km and a total length of bridges and tunnels of 53.217 km. The design speed of the highway is 100 km/h. The starting point is located at Henan Interchange in Hehe

Project Information FAQ

Project Information

4 Q
The project “G1816 Wuhai-Maqin Expressway Cooperation to Saierlong (Ganqingjie) section” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the construction of the G1816 Wuhai-Maqin Expressway Cooperation to Saierlong (Ganqingjie) section, located in Gannan Prefecture, Gansu Province, China. The two-way four-lane expressway has a total length of 102.767 km and a total length of bridges and tunnels of 53.217 km. The design speed of the highway is 100 km/h. The starting point is located at Henan Interchange in Hehe City, in Luqu County, Gannan Tibetan Autonomous Prefecture and the end point is in Saierlong (Ganqingjie). The project has been awarded by the Gansu Provincial Government under a 44-year "BOT" and "construction general contracting" mode, including the construction and the operation periods. The sponsor is CCCC First Public Bureau Group Consortium, following a competitive bidding process held between January 30, 2022 and February 8, 2022. The total investment value of the project is $2496.11 million (16.959 billion yuan). Construction started on 13 May, 2022. https://www.seetao.com/details/136475.html https://www.seetao.com/details/139028.html https://www.seetao.com/details/149138.html https://www.seetao.com/details/157494.html http://www.xinhuanet.com/2022-05/14/c_1128650647.htm

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data