G6A Pump Station
Sector: Water Supply and Storage • Location: West Palm Beach, Florida, United States of America
Source: Dodge USA
The purpose of this Project is to construct a new pump station G-6A near the existing S-6 pump station. The new pump station will have two (2) 500-cfs, diesel-engine-driven pumps and one (1) 100-cfs, electric-motor-driven pump, for a total pumping capacity of 1,100 cfs. Work includes pump station intake and discharge canal excavation.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
- Location
- West Palm Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about G6A Pump Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this Project is to construct a new pump station G-6A near the existing S-6 pump station. The new pump station will have two (2) 500-cfs, diesel-engine-driven pumps and one (1) 100-cfs, electric-motor-driven pump, for a total pumping capacity of 1,100 cfs. Work includes pump station intake and discharge canal excavation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | West Palm Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
