IFC is considering a debt investment of up to US$120 million for the acquisition, operation and maintenance of a 580MW Gabal El Zeit (GEZ) wind farm, in the Red Sea Governorate, Egypt (the Project) to be sponsored by Alcazar Energy Partners III SLP, managed by its general partner, Alcazar Energy Management Services (Alcazar Energy). The Project is part of Egypt’s state-owned asset privatization pr

Status
Prospective
Sector
Wind, Power Generation (CCGT), Raw Materials, Government
Location
Egypt
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Gabal El Zeit

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Gabal El Zeit” is an infrastructure initiative in the Wind sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

IFC is considering a debt investment of up to US$120 million for the acquisition, operation and maintenance of a 580MW Gabal El Zeit (GEZ) wind farm, in the Red Sea Governorate, Egypt (the Project) to be sponsored by Alcazar Energy Partners III SLP, managed by its general partner, Alcazar Energy Management Services (Alcazar Energy). The Project is part of Egypt’s state-owned asset privatization program initiated by the Government of Egypt (GoE) in early 2023, under which the New and Renewable Energy Authority (NREA) is divesting this operational windfarm. The Project entered into a 25-year Power Purchase Agreement (PPA) with the Egyptian Electricity Transmission Company (EETC) guaranteed by the Ministry of Finance on terms consistent with those executed under the Build-Own-Operate (BOO) Program. The 580 MW GEZ wind farm was constructed and achieved operations in three phases between 2014 and 2018: (i) GEZ 1, comprising 120 turbines across 38.5 km2, commissioned as 200 MW in August 2014 and expanded by a further 40 MW in July 2018, financed by Credit Institute for Reconstruction (KfW) and the European Investment Bank (EIB); (ii) GEZ 2, comprising 110 turbines across 44.9 km2, commissioned in March 2017 and financed by Japan International Cooperation Agency (JICA); and (iii) GEZ 3, comprising 60 turbines across 107.2 km2, commissioned in June 2018 and financed by the Spanish Corporate Internationalization Fund (FIEM). The Project will ultimately be divided into three subprojects, with IFC providing a separate debt facility to each of the three borrowers. The Overhead Transmission Lines (OHTLs) and the substation are existing facilities and are not part of the Alcazar Energy acquisition, but which nonetheless will require Post Construction Fatality Monitoring (PCFM), within Alcazar Energy acquired concession. The GEZ wind farm is currently operated and maintained by Siemens Gamesa Renewable Energy (SGRE). Following the acquisition, SGRE is expected to remain involved in the Operation and Maintenance (O&M) of the facility, under Alcazar Energy's management and its E&S Requirements and Management Systems. The precise scope, duration and contractual structure of these arrangements are currently under negotiation among the parties. Potential arrangements under consideration would include: (i) continued SGRE involvement in O&M services; (ii) spare parts provision, and (iii) Supervisory Control and Data Acquisition (SCADA) service, either directly or in conjunction with a qualified third-party service provider. The Project is located within the Red Sea/Rift Valley flyway, a globally important migration corridor used annually by over 1.5 million Migratory Soaring Birds (MSBs) of 37 species and is located within the GEZ Important Bird Area (IBA) and Key Biodiversity Area (KBA). The IBA is designated to protect a strategic location within the flyway where birds are funnelled across the Gulf of Suez (GoS) at its narrowest crossing point during their spring and autumn migration, often landing in large numbers and flying at low altitudes; numbers crossing the Project area each season represent more than 1% of the flyway population for at least 21 species. As part of the proposed finance, no increase in tip height or addition of new turbines will take place during the lifetime of the Project.

Original sector

V-BC - Wind Power - Renewable Energy Generation

Location

Country

Egypt

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Raw Materials, Government

Article published date

2026-09-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project