logo
Project

Gabon - Infrastructure Sector Support Project - Phase I (PASIG-I)

One of 1,036 projects Taiyo tracks in Gabon.

Source: African Development Bank (AfDB)

This Infrastructure Sector Support Project - Phase I (PASIG-I) is an investment operation. This first phase consists mainly of: (a) construction and asphalting of the Ndendé-Doussala road section (49 km) and the border bridge over the Ngongo River; (b) construction and asphalting of 21,280 km of roads in Libreville, including related developments (sanitation, street lighting, beautification); and

Sector
Raw Materials, Warehouse, Water Supply and Storage, Car parking, Bridge, Solar, Forest Products and Packaging, Road, Metal, Government, Automotive
Location
Gabon
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Gabon - Infrastructure Sector Support Project - Phase I (PASIG-I)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gabon - Infrastructure Sector Support Project - Phase I (PASIG-I)” is an infrastructure initiative in the Raw Materials sector, located in Gabon. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This Infrastructure Sector Support Project - Phase I (PASIG-I) is an investment operation. This first phase consists mainly of: (a) construction and asphalting of the Ndendé-Doussala road section (49 km) and the border bridge over the Ngongo River; (b) construction and asphalting of 21,280 km of roads in Libreville, including related developments (sanitation, street lighting, beautification); and (c) detailed sector and technical studies to feed a substantial pipeline of transformative projects in the road subsector. The project is part of the Trans-Gabonese corridor development scheme expected to link Libreville to Mayumba in the South, and crosses timber, mining, metallurgy, agro-industry, fishing, livestock and ecotourism hubs, among others. However, developing the economic potential in the project impact area, which is limited to Ngounié Province, is currently undermined by the poor state of transport infrastructure. The main expected outcomes include improved logistics chain service on this road axis as well as mobility and living conditions for people in the PIA. The project will reduce travel distances by increasing the access rate to basic services for residents of the PIA. Covering the period 2020-2023, PASIG I is structured around five components include, apart from road works on the Ndendé - Doussala section and urban roads, ancillary developments (rural roads and social action) and other measures aimed at better protecting the road infrastructure and facilitating transportation.

Original sector

Transport & Storage

Budget

Location

Country

Gabon

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Warehouse, Water Supply and Storage, Car parking, Bridge, Solar, Forest Products and Packaging, Road, Metal, Government, Automotive

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project