logo
Project

Gabon - Kinguele Aval Hydropower Project

Sector: Power Generation (CCGT) • Location: Gabon

Source: African Development Bank (AfDB)

The project entails the design, construction, and operation of Kinguélé Aval hydropower plant, with an estimated installed capacity of 34.1 MW and net annual gross output of 203GWh.The project will be located c. 90 km from Libreville on the Mbei River, located next to the Monts de Cristal (Estuaire region, North-West of Gabon).Two hydro dams, built upstreamin the Mbei Valley,

Sector
Power Generation (CCGT), Hydro, Government
Location
Gabon
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Gabon - Kinguele Aval Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gabon - Kinguele Aval Hydropower Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Gabon. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the design, construction, and operation of Kinguélé Aval hydropower plant, with an estimated installed capacity of 34.1 MW and net annual gross output of 203GWh.The project will be located c. 90 km from Libreville on the Mbei River, located next to the Monts de Cristal (Estuaire region, North-West of Gabon).Two hydro dams, built upstreamin the Mbei Valley, are regulating the river namely Kinguélé Amount (57.6 MW), 10km upstreamand Tchimbélé (68MW), 50km upstream. All electricity generated by the Project is expected to be sold to the Government of Gabon (“GoG”)on a Take or Pay basis.

Original sector

Energy

Budget

Location

Country

Gabon

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project