Gadnadi Medium Irrigation Project

Sector: Hydro • Location: Ratnagiri, Maharashtra, India

Source: India Investment Grid (IIG)

Project
Closed

Information Department of water resources-MH - II has come up with Gadnadi Medium Irrigation Project with a ticket size of 602.75 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project The Gadnadi Medium Irrigation Project is being constructed in

Project Information FAQ

Project Information

5 Q
The project “Gadnadi Medium Irrigation Project” is an infrastructure initiative in the Hydro sector, located in Ratnagiri, Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Department of water resources-MH - II has come up with Gadnadi Medium Irrigation Project with a ticket size of 602.75 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project The Gadnadi Medium Irrigation Project is being constructed in Ratnagiri district of Maharashtra. The construction work of the project was started in the year 1987. The project was included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion. The project envisages construction of the following components. [i] A 487.00 m long earth dam, masonary dam of length 44m with the maximum height of 71.38 m, and 41 m long gated ogee type spillway having 3 Nos of radial gates of size 12 X 5 m on the right flank across river Gadnadi [ii] 27 km long Left Bank Canal [LBC] with full supply discharge of 1.46 m3/s & and 47.00 km long Right Bank Canal [RBC] with full supply discharge of 4.6 m3/s along with distribution network in Sangameshwar and Chiplun taluka. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 154.119 crore Eligible Central Assistance was Rs 4.143 crore CA released since 2016 till March 2023- 3.4971 crore Physical progress- 93 percentage Financial Progress- 104.88 percentage Ultimate Irrigation Potential is 4868 Ha Irrigation Potential created till December 2023- 4868 Ha and overall 6003 ha PMKSY Components is Completed in December 2023

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data