logo
ProjectPlanning Schematics

GA/DOT: SR 17 Bridge Replacement

Planning schematics · Georgia · Last reported Sep 2025

Source: Dodge

The project proposes to widen SR 17 from two-lanes to four-lanes and is classified as a rural principal arterial. A flush median will be utilized throughout the project corridor ranging from 4-ft to a 14-ft two-way left-turn lane. Bike lanes will be present from Slay Rd. to Robinwood Lane. The widening will require the replacement of a bridge over Dry Fork Creek. A bridge over Broad River and a br

Status
Prospective
Sector
Road, Bridge, Power Transmission, Power Generation (CCGT), Commercial
Location
Elberton, Georgia, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about GA/DOT: SR 17 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “GA/DOT: SR 17 Bridge Replacement” is an infrastructure initiative in the Road sector, located in Elberton, Georgia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project proposes to widen SR 17 from two-lanes to four-lanes and is classified as a rural principal arterial. A flush median will be utilized throughout the project corridor ranging from 4-ft to a 14-ft two-way left-turn lane. Bike lanes will be present from Slay Rd. to Robinwood Lane. The widening will require the replacement of a bridge over Dry Fork Creek. A bridge over Broad River and a bridge over Broad River Overflow are programmed for construction as separate projects. The Broad Ri...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Elberton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Bridge, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project