GA/DOT: SR 3 Lane Improvement
Planning schematics · Georgia · Last reported Sep 2024
Source: Dodge USA
Based on the available information, the proposed improvement is needed to accommodate the growing traffic volumes on SR 3 and improve the roadway capacity and reduce crash frequency at this location. Final determination of logical termini is dependent on the Office of Environmental Services coordination with FHWA during the development of the environmental document.
- Status
- Prospective
- Sector
- Commercial, Road, Manufacturing (Industrial), Residential
- Location
- Resaca, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about GA/DOT: SR 3 Lane Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Based on the available information, the proposed improvement is needed to accommodate the growing traffic volumes on SR 3 and improve the roadway capacity and reduce crash frequency at this location. Final determination of logical termini is dependent on the Office of Environmental Services coordination with FHWA during the development of the environmental document. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Resaca |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Manufacturing (Industrial), Residential |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
