GA/DOT: T32 Mitigation stream credit
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
0016568 Charlton Stream. GDOT requires mitigation credits in order to satisfy wetland or stream mitigation according to the United States Army Corps of Engineers (USACE) SOP for mitigation. Required credits are as indicated in Table 7. GDOT desires to purchase said credits from a USACE permitted mitigation bank having primary service area containing the Hydrologic Unit Code (HUC) indicated
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Water Supply and Storage
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about GA/DOT: T32 Mitigation stream credit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 0016568 Charlton Stream. GDOT requires mitigation credits in order to satisfy wetland or stream mitigation according to the United States Army Corps of Engineers (USACE) SOP for mitigation. Required credits are as indicated in Table 7. GDOT desires to purchase said credits from a USACE permitted mitigation bank having primary service area containing the Hydrologic Unit Code (HUC) indicated |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Water Supply and Storage |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
