Gage Elementary & Churchill Elementary School Improvements
Sector: Water Supply and Storage • Location: Rochester, Minnesota, United States of America
Source: Dodge USA
The work includes the construction of approximately: Remove Bituminous Pavement 10150 SY - Excavation - Common 2525 CY - Select Granular Embankment 725 CY - Aggregate Base, Class 5 2180 CY - Asphalt Paving 2330 TON - 4"-6" Concrete Walk 2810 SF - Conc Curb and Gutter 950 LF - Concrete Stairs & Railing 1 LS - Traffic Control 1 LS - Sodding Type Lawn 1750 SY - Remove Catch Basin 4 EACH - Pavement Ma
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Rail, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
- Location
- Rochester, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gage Elementary & Churchill Elementary School Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the construction of approximately: Remove Bituminous Pavement 10150 SY - Excavation - Common 2525 CY - Select Granular Embankment 725 CY - Aggregate Base, Class 5 2180 CY - Asphalt Paving 2330 TON - 4"-6" Concrete Walk 2810 SF - Conc Curb and Gutter 950 LF - Concrete Stairs & Railing 1 LS - Traffic Control 1 LS - Sodding Type Lawn 1750 SY - Remove Catch Basin 4 EACH - Pavement Markings 6350 LF - 12" RC Pipe Sewer Design 3006 Class V 95 LF - Drainage Structure Type 1 16 LFThe... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Rochester |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Rail, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
