logo

GAINESVILLE MIDTOWN MULTI-USE TRAIL FROM PARKER ST TO SR 60

Sector: Broadband • Location: Gainesville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Phase II: Multi-use trail form MLK Jr. Blvd to Industrial Blvd and along a former CSX railroad toward Grove St. 12' wide, approx. 2900' long concrete trail and trailhead. Benches, trashcans, bike racks, landscaping, pedestrian lighting and fiber-optic cable for future security camera system. Phase II B: Parker St streetscaping runs approx. 480' from the intersection of Main St to the existing Mid

Project Information FAQ

Project Information

4 Q
The project “GAINESVILLE MIDTOWN MULTI-USE TRAIL FROM PARKER ST TO SR 60” is an infrastructure initiative in the Broadband sector, located in Gainesville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Phase II: Multi-use trail form MLK Jr. Blvd to Industrial Blvd and along a former CSX railroad toward Grove St. 12' wide, approx. 2900' long concrete trail and trailhead. Benches, trashcans, bike racks, landscaping, pedestrian lighting and fiber-optic cable for future security camera system. Phase II B: Parker St streetscaping runs approx. 480' from the intersection of Main St to the existing Midtown multi-use trail. Sidewalks will be installed on both sides of the street. Phase II C: Main St streetcaping involves construction of 10' wide sidewalks along approx. 200' of Main St, from Parker St to College Ave. Phase II D: College Ave streetscaping includes construction of 10' wide sidewalks along 300' of College Ave, from Main St to Bradford St.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data