Galactica-Pegasus Helium Development Project
Substantial completion · Colorado · Last reported Dec 2025
Source: Investing.com
The Galactica-Pegasus helium development project in Colorado has reached substantial completion of its production facility, with first gas production expected before year-end 2025. The gathering system has been pressure tested and connected to the production facility, and commissioning is scheduled to begin soon. The project completed a six-well development drilling campaign in early 2025, encount
- Status
- Under Construction
- Sector
- Energy
- Location
- Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Investing.com
ConstructChat
Ask ConstructChat about Galactica-Pegasus Helium Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | substantial completion |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Galactica-Pegasus helium development project in Colorado has reached substantial completion of its production facility, with first gas production expected before year-end 2025. The gathering system has been pressure tested and connected to the production facility, and commissioning is scheduled to begin soon. The project completed a six-well development drilling campaign in early 2025, encountering helium concentrations of up to 3.3%. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | Investing.com |
URL |
More Details
Record type | Project |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
