Galați–Giurgiulești 110 kV Interconnector
Sector: Power Generation (CCGT) • Location: Giurgiulești, Moldova
Source: logos-pres.md
A proposed 110 kV interconnector power line between Galați in Romania and Giurgiulești in Moldova, aimed at improving electricity supply reliability in southern Moldova, providing alternative import routes, and increasing cross-border electricity exchange capacity. The project is currently at the feasibility and technical viability analysis stage, with coordination ongoing between Moldovan and Rom
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Giurgiulești, Moldova
- Updated
- 22 Jul 2026
- Source
- logos-pres.md
ConstructChat
Ask ConstructChat about Galați–Giurgiulești 110 kV Interconnector
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed 110 kV interconnector power line between Galați in Romania and Giurgiulești in Moldova, aimed at improving electricity supply reliability in southern Moldova, providing alternative import routes, and increasing cross-border electricity exchange capacity. The project is currently at the feasibility and technical viability analysis stage, with coordination ongoing between Moldovan and Romanian transmission system operators. |
Original sector | Energy |
Location
Country | Moldova |
City | Giurgiulești |
Source
Source | logos-pres.md |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Moldova
- RED Union Fenosa S.A.
- Red Chisinau, S.A.; Red Centru, S.A.; and Red Sud, S.A.
- Union Fenosa Moldova
- Improving the cross-border public transportation using electric buses supplied with renewable energy
- Feasibility Study on Synchronous Interconnection of Ukrainean and Molodvan Power Systems to ENTSO-E Continental European Power System
- UF Moldova Distribution Company
- Electricity Distribution Upgrade
- CHISINAU WATER SERVICES REHABILITATION PROJECT
