logo
ProjectComplete

Galnaftogaz

Sector: Manufacturing (Industrial) • Location: Ukraine

Source: European Bank for Reconstruction and Development (EBRD)

The EBRD loan will partly fund the Company’s ongoing programme of reconstruction, construction and acquisition of petrol stations providing high levels of quality and service and meeting the highest environmental, health and safety standards. In addition, EBRD involvement will support strategic goals of the Company such as: Use of EBRD proceeds by the Company will be monitored by the Bank and its

Status
Closed
Sector
Manufacturing (Industrial), Residential, Oil and Gas, Commercial, Government
Location
Ukraine
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Galnaftogaz

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Galnaftogaz” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Ukraine. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The EBRD loan will partly fund the Company’s ongoing programme of reconstruction, construction and acquisition of petrol stations providing high levels of quality and service and meeting the highest environmental, health and safety standards. In addition, EBRD involvement will support strategic goals of the Company such as: Use of EBRD proceeds by the Company will be monitored by the Bank and its independent engineer along with the representatives of the IFC and BSTDB which have independently extended related loans to the Company. The proposed project supports an effective independent player committed to the highest standards of corporate governance and environmental protection. The project will increase private sector competition and will be the first example of transforming a former state merchandising apparatus in Ukraine. While physical expansion is a necessary element of growth, the current financing is specifically conditioned on maintaining the Company’s focus on environmental renovation, good accounting systems for transparency, and proper working capital provision for financial stability. Specific undertakings will be to diversify supply and to make provision for independent board representation. Among the ancillary benefits will be demonstration of the viability of a high quality/service niche player, and increased local participation and development of local management. OJSC Galnaftogaz (GNG or the Company), is the largest independent (not tied to a refinery) owner/operator of petrol stations in the Ukraine. Headquartered in Lviv, the Company was formed in 2001 from the merger and privatisation of three, former Soviet, West Ukrainian oil product manufacturing and distribution companies (“naftoprodukt”) dating back to the 1930’s. The Company has most of its petrol stations in Western Ukraine but is building a presence in the Kiev area and elsewhere under its popular “OKKO” brand. USD 25 million Senior Secured Loan. The EBRD loan is part of ongoing expansion which will be reviewed from time to time based upon results and further resources available. The project was screened B/1. Independent environmental investigations including a site visit by the Bank’s Environmental Specialist confirmed that, as a result of control, preventive and mitigation measures applied, the environmental, health and safety issues are unlikely to present significant impacts. The Bank's due diligence confirmed that the Company adheres to high international standards and the proposed transaction will result in further modernisation of the filling stations in line with international good practice, including compliance with the relevant EU Directives relating to fuel quality, vapour recovery, recycling and energy efficiency. The stations currently sell high quality and unleaded fuels which are not common in the market particularly in Western Ukraine. There are a number of improvements, which when implemented would further increase EHS performance. These are included in an extensive environmental action plan (EAP) which has already been developed. According to IFC the project also meets all applicable World Bank/IFC environment and social policies on completion of the EAP. None. c/o Paul Shapiro Senior Banker, EBRD E-mail: shapirop@ebrd.com

Original sector

Natural Resources

Location

Country

Ukraine

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Residential, Oil and Gas, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project