logo

Galvanized Pipe Replacement

Sector: Water Supply and Storage • Location: Muscle Shoals, Alabama, United States of America

Source: Dodge USA

Project
Closed

The purpose of this bid for various galvanized water main replacement projects it to provide for the expedient construction of projects as designated by Muscle Shoals Utilities Board, utilizing unit prices for commonly performed contractor work items. Bid items include 2 PVC water main, taps, services, valves, meter boxes, clearing, asphalt, concrete, grassing and clean-up. Water main and service

Status
Closed
Sector
Water Supply and Storage, Cement, Power Transmission, Road, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
Location
Muscle Shoals, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Galvanized Pipe Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Galvanized Pipe Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Muscle Shoals, Alabama, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of this bid for various galvanized water main replacement projects it to provide for the expedient construction of projects as designated by Muscle Shoals Utilities Board, utilizing unit prices for commonly performed contractor work items. Bid items include 2 PVC water main, taps, services, valves, meter boxes, clearing, asphalt, concrete, grassing and clean-up. Water main and service line materials to be provided by the Owner.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Muscle Shoals

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Power Transmission, Road, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-06-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project