logo

Gambia - Costal Protection Study

Sector: Government • Location: Gambia

Source: African Development Bank (AfDB)

Project

This intervention concerns the Coastal Protection Study. It should help to identify the most appropriate protection measures for critical areas. These measures aim not only to protect the infrastructure located on the waterfront, but also to restore the balance of the ecosystem and thus promote economic activities. The new protection structures envisaged in vulnerable coastal areas and the coastal

Project Information FAQ

Project Information

4 Q
The project “Gambia - Costal Protection Study” is an infrastructure initiative in the Government sector, located in Gambia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This intervention concerns the Coastal Protection Study. It should help to identify the most appropriate protection measures for critical areas. These measures aim not only to protect the infrastructure located on the waterfront, but also to restore the balance of the ecosystem and thus promote economic activities. The new protection structures envisaged in vulnerable coastal areas and the coastal development system should also help to revitalize the constantly declining activities of hotels located on the waterfront and develop the tourist industry. The study is expected to be conducted in two phases. The first phase includes (A) the technical feasibility and economic viability study of the protective structures to be built on the Gambian coast, (B) the detailed environmental impact study for component A. The second phase covers detailed technical studies, preparation of tender documents and cost estimates for Component A activities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data