Gamesa Gabal el Zeit Wind Farm
Sector: Raw Materials • Location: Egypt, Arab Rep.
Source: World Bank Group
Gamesa was planning the development of the 200MW Gamesa Gabal el Zeit Wind Farm, 400km south of Cairo.
Gamesa was to supply 100 turbines of the G80 type, 2.0MW each. Turbines were to be supplied by 2013. The contract was signed in January 2012, reported here as under development in 2011. The project was tendered in September 2009, and was open to 10 shortlisted firms. Initially, 72 firms were in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | concluded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Gamesa was planning the development of the 200MW Gamesa Gabal el Zeit Wind Farm, 400km south of Cairo. Gamesa was to supply 100 turbines of the G80 type, 2.0MW each. Turbines were to be supplied by 2013. The contract was signed in January 2012, reported here as under development in 2011. The project was tendered in September 2009, and was open to 10 shortlisted firms. Initially, 72 firms were interested. The projects were to be commissioned by 2014. No financial closure was reported. The project was expected to be funded by the KfW, the EIB and the EU Neighborhood Investment Facility (NIF). In 2010 it was reported that Japan promised a $432 million soft loan. An estimated cost of $432 million was maintained here (Japanese potential loan). This seems to be either old information, of a separate wind farm. It also involved a different contract structure (BOO + 20yr PPA). http://www.eolicenergynews.org/?p=4941 http://www.menafn.com/menafn/1093313529/Egypt-gets-USD430m-loan-for-wind-power-project http://www.eib.org/projects/pipeline/2007/20070089.htm http://www.energymatters.com.au/index.php?main_page=news_article&article_id=1956 http://www.energymatters.com.au/index.php?main_page=news_article&article_id=1956 Conflicting info on contract sturcture and potential financing. More info required. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
