Gamesa Gabal el Zeit Wind Farm
Sector: Wind • Location: Egypt, Arab Rep.
Source: World Bank Group
Gamesa was planning the development of the 200MW Gamesa Gabal el Zeit Wind Farm, 400km south of Cairo.
Gamesa was to supply 100 turbines of the G80 type, 2.0MW each. Turbines were to be supplied by 2013. The contract was signed in January 2012, reported here as under development in 2011. The project was tendered in September 2009, and was open to 10 shortlisted firms. Initially, 72 firms were in
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Gamesa Gabal el Zeit Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | concluded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Gamesa was planning the development of the 200MW Gamesa Gabal el Zeit Wind Farm, 400km south of Cairo. Gamesa was to supply 100 turbines of the G80 type, 2.0MW each. Turbines were to be supplied by 2013. The contract was signed in January 2012, reported here as under development in 2011. The project was tendered in September 2009, and was open to 10 shortlisted firms. Initially, 72 firms were interested. The projects were to be commissioned by 2014. No financial closure was reported. The project was expected to be funded by the KfW, the EIB and the EU Neighborhood Investment Facility (NIF). In 2010 it was reported that Japan promised a $432 million soft loan. An estimated cost of $432 million was maintained here (Japanese potential loan). This seems to be either old information, of a separate wind farm. It also involved a different contract structure (BOO + 20yr PPA). http://www.eolicenergynews.org/?p=4941 http://www.menafn.com/menafn/1093313529/Egypt-gets-USD430m-loan-for-wind-power-project http://www.eib.org/projects/pipeline/2007/20070089.htm http://www.energymatters.com.au/index.php?main_page=news_article&article_id=1956 http://www.energymatters.com.au/index.php?main_page=news_article&article_id=1956 Conflicting info on contract sturcture and potential financing. More info required. |
Original sector | Energy |
Budget |
Location
Country | Egypt |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials, Commercial, Government |
Article published date | 2024-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
