Gamesa
Completed · India
Source: International Finance Corporation (IFC)
The proposed project is to provide debt financing of up to €11 million to Gamesa Wind Turbines (“GWT” or the “Company”), a wind turbine assembly facility in India (the “Project”). The turbines assembled at this facility will be exported, sold domestically as well as used in local wind farms developed by the Company.Spain-based Gamesa Corporación Tecnológica S.A. (“Gamesa” or the “Sponsor”), which
- Status
- Closed
- Sector
- Raw Materials, Manufacturing (Industrial), Wind, Solar, Government, Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Gamesa
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project is to provide debt financing of up to €11 million to Gamesa Wind Turbines (“GWT” or the “Company”), a wind turbine assembly facility in India (the “Project”). The turbines assembled at this facility will be exported, sold domestically as well as used in local wind farms developed by the Company.Spain-based Gamesa Corporación Tecnológica S.A. (“Gamesa” or the “Sponsor”), which is one of the three largest wind turbine manufacturers globally, established GWT in late 2009 to lay the groundwork for producing wind turbines in India. The GWT facility is located in Chennai and will produce cost effective wind turbines specially suited for the Indian grid and wind conditions. GWT is also involved with conducting research on developing sites appropriate for wind farms in the region and has, to date, signed contracts in India and Sri Lanka for the installation of more than 60 MW. The facility has a capacity of 200 MW per annum and the Company has plans to scale it to over 800 MW in the coming two years through the new wind turbine assembly facility. |
Original sector | HA - Wind Turbine Machinery |
Location
Country | India |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Manufacturing (Industrial), Wind, Solar, Government, Power Generation (CCGT) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
