Gammon Construction’s Global Switch Data Centre (Phase 2) project in Tseung Kwan O in Hong Kong includes the requirements to design and install a chilled-water thermal-energy storage system with a “Design for Manufacturing and Assembly (DfMA)” approach. The chilled-water thermal-energy storage system provides resilience to ensure the chilled water remains available at all times, whether due to int

Project Information FAQ

Project Information

4 Q
The project “Gammon installs the heaviest DfMA Thermal Tanks in Hong Kong” is an infrastructure initiative in the Commercial sector, located in Hong Kong, Hong Kong. Taiyo aggregates data on it from Highways Today.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Gammon Construction’s Global Switch Data Centre (Phase 2) project in Tseung Kwan O in Hong Kong includes the requirements to design and install a chilled-water thermal-energy storage system with a “Design for Manufacturing and Assembly (DfMA)” approach. The chilled-water thermal-energy storage system provides resilience to ensure the chilled water remains available at all times, whether due to internal equipment or an external power failure. The DfMA with full off-site fabrication could factor in the consideration of site safety, quality and duration of the construction for this vital equipment. The team spent four days to install the heaviest DfMA thermal tanks in Hong Kong. The final design consisted of four 175 m³ thermal tanks, which each weigh 50 tonnes, and measure 7m in diameter and 9m high. Every element of the tanks, including all steel works, fencing, cat ladders, baffles, coating, thermal insulation and external cladding, and even maintenance provisions, was then manufactured, preassembled and tested off-site in a DfMA factory. By doing this, Gammon has successfully eliminated the need for extensive scaffolding associated with the high-level works, as well as the tremendous amount of on-site welding and painting activities, heavy lifting with complicated vertical operations, as well as the confined space work inside the tanks. Once completed off-site in the factory, the tanks were shipped by barge to the site. Before work began, building information modelling (BIM) was adopted to streamline and verify our design. BIM was applied to structural analysis to ensure integrity and use of correct steel members, while computational fluid dynamics made certain that the components inside the tank were appropriate for effective thermal transfer of temperature profiles. Once completed in the factory, the tanks were shipped by barge, hoisted to the roof and slid into their final positions in one action – no hot works and no high-level assembly were required. Installation of the four tanks took four days. They are also the heaviest DfMA thermal tanks installed in Hong Kong.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data