logo

Ganga Bridge under Ring Road Phase-II Project

Sector: Automotive • Location: Varanasi, Uttar Pradesh, India

Source: Times of India

Project
Under Construction

The project involves the construction of a 1.8 km six-lane bridge on the Ganga river as part of the 27 km Ring Road phase-II project connecting Varanasi and Chandauli. One side of the bridge with a three-lane road for light vehicles has been opened, reducing travel time significantly. The second lane is expected to be completed by December, after which heavy vehicle movement will commence. The pro

Status
Under Construction
Sector
Automotive, Bridge, Power Transmission, Road, Power Generation (CCGT), Government
Location
Varanasi, Uttar Pradesh, India
Updated
22 Jul 2026
Source
Times of India

ConstructChat

Ask ConstructChat about Ganga Bridge under Ring Road Phase-II Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ganga Bridge under Ring Road Phase-II Project” is an infrastructure initiative in the Automotive sector, located in Varanasi, Uttar Pradesh, India. Taiyo aggregates data on it from Times of India.

Participants

Sponsoring Agency

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of a 1.8 km six-lane bridge on the Ganga river as part of the 27 km Ring Road phase-II project connecting Varanasi and Chandauli. One side of the bridge with a three-lane road for light vehicles has been opened, reducing travel time significantly. The second lane is expected to be completed by December, after which heavy vehicle movement will commence. The project faced multiple delays due to changes in design, flood level considerations, Covid lockdown, utility shifting, and land acquisition issues.

Original sector

Transportation

Budget

Location

Country

India

State

Uttar Pradesh

City

Varanasi

Source

Source

Times of India

URL

More Details

Record type

Project

Sector

Automotive, Bridge, Power Transmission, Road, Power Generation (CCGT), Government

Article published date

2025-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project