logo

Gao II slope program

Sector: Road • Location: Mali

Source: KFW Bank aus Verantwortung

Project
Active

In the Gao region, as in the whole of northern Mali, a combination of a deteriorating security situation and the slow implementation of the 2015 peace agreement, combined with state fragility and complex structural problems, can be observed. The aim of the project is to improve the living conditions of the population in Gao and thus contribute to stabilization and peace consolidation in the region

Project Information FAQ

Project Information

5 Q
The project “Gao II slope program” is an infrastructure initiative in the Road sector, located in Mali. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In the Gao region, as in the whole of northern Mali, a combination of a deteriorating security situation and the slow implementation of the 2015 peace agreement, combined with state fragility and complex structural problems, can be observed. The aim of the project is to improve the living conditions of the population in Gao and thus contribute to stabilization and peace consolidation in the region. To this end, rural slopes are primarily being repaired. In addition, accompanying socio-economic measures along the improved slopes are being financed in order to support the exploitation of the socio-economic effects of the slopes and at the same time strengthen the resilience of the local population. Just like the slope sections, the specific measures will be selected in the course of implementation with close involvement of the local population and local authorities, based on needs and can, for example, include employment-oriented activities such as market infrastructure. The aim is to make all construction measures as labor-intensive as possible (cash for work) in order to create short-term income and employment opportunities, which should show young people in particular a perspective beyond violence. Finally, the capacities of the most important local actors for the implementation, operation and maintenance of the individual measures are to be strengthened. The political sponsor of the project is the Ministère de l'Administration Territoriale et de la Décentralisation (MATD). The role of the project sponsor, responsible for the implementation of the project, is assumed by Deutsche Welthungerhilfe (WHH) in cooperation with a local NGO. The target group that benefits from the measures is primarily the rural population in the Gao region. Implementation began in January 2022 and is designed to last for 42 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data