GAOA Buffalo Gap Campground Septic System
One of 10,000+ projects Taiyo tracks in North Dakota.
Source: Dodge USA
GAOA Buffalo Gap Campground Septic System Dakota Prairie Grasslands- Buffalo Gap Camground Septic System and Lift Station Renovation Dakota Prairie Grasslands. Install a new septic tank according to the drawing and specification found herein. Locate the two access lids on two existing septic tanks and install grade ring inserts and grade rings to extend risers above grade with a cover secured with
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Commercial, Water Supply and Storage
- Location
- Bismarck, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about GAOA Buffalo Gap Campground Septic System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GAOA Buffalo Gap Campground Septic System Dakota Prairie Grasslands- Buffalo Gap Camground Septic System and Lift Station Renovation Dakota Prairie Grasslands. Install a new septic tank according to the drawing and specification found herein. Locate the two access lids on two existing septic tanks and install grade ring inserts and grade rings to extend risers above grade with a cover secured with vandal resistant screws. Complete work for both Comfort Stations in the Campground. One Comfort ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Bismarck |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Water Supply and Storage |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
