Gaoa Maier Dam Reconstruction
Sector: Water Supply and Storage • Location: Plevna, Montana, United States of America
Source: Dodge USA
Dewater reservoir and construction area. 2. Excavate a portion of the existing dam embankment and foundation to allow construction of the new outlet works. 3. Reconstruct the dam embankment, including a. Placement of compacted fill from onsite borrow sources, b. Placement of imported rock for riprap slope protection along the upstream face, c. Placement and compaction of imported sand and gravel f
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Hydro, Commercial, Waste Processing and Treatment
- Location
- Plevna, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Gaoa Maier Dam Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dewater reservoir and construction area. 2. Excavate a portion of the existing dam embankment and foundation to allow construction of the new outlet works. 3. Reconstruct the dam embankment, including a. Placement of compacted fill from onsite borrow sources, b. Placement of imported rock for riprap slope protection along the upstream face, c. Placement and compaction of imported sand and gravel for internal filter and drain features, 4. Construct precast concrete spillway riser for a new pri... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Plevna |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Hydro, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
