Gaoa Suf Forest 152 South Brule River Bridge Replacement REB
Sector: Metal • Location: Iron River, Michigan, United States of America
Source: Dodge
The USDA Forest Service (FS), Superior National Forest, has a requirement for a Forest Road 152 South Brule River Bridge Replacement. The work will take place in Cook County, Minnesota. This procurement will be solicited using North American Industry Classification System (NAICS) 237310 Highway, Street, and Bridge Construction, with a small business size standard of $45M.
- Status
- Closed
- Sector
- Metal, Bridge, Road, Commercial, Manufacturing (Industrial), Raw Materials
- Location
- Iron River, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Gaoa Suf Forest 152 South Brule River Bridge Replacement REB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The USDA Forest Service (FS), Superior National Forest, has a requirement for a Forest Road 152 South Brule River Bridge Replacement. The work will take place in Cook County, Minnesota. This procurement will be solicited using North American Industry Classification System (NAICS) 237310 Highway, Street, and Bridge Construction, with a small business size standard of $45M. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Iron River |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Bridge, Road, Commercial, Manufacturing (Industrial), Raw Materials |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
