Gaoa Teton Dam Reconstruction
Sector: Water Supply and Storage • Location: Rawlins, Wyoming, United States of America
Source: Dodge
The Bureau of Land Management (BLM) has a construction requirement for all labor, materials, equipment, and supervision to repair the Teton Dam. Major items of work include: 1) Dewater reservoir and the construction area. 2) Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works structures and construct the new outlet works. 3) Strip the upstream and d
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Consumer Products, Hydro, Commercial
- Location
- Rawlins, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Gaoa Teton Dam Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bureau of Land Management (BLM) has a construction requirement for all labor, materials, equipment, and supervision to repair the Teton Dam. Major items of work include: 1) Dewater reservoir and the construction area. 2) Excavate a portion of the existing dam embankment and foundation to remove the existing outlet works structures and construct the new outlet works. 3) Strip the upstream and downstream surface of the dam embankment to remove all vegetation. 4) Reconstruct the dam embankme... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Rawlins |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Consumer Products, Hydro, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
