Garage Building Level 2
Start · California · Last reported Sep 2024
Source: Dodge USA
Project Description: Project Title: T.I. Rohr Inc.: North Parking Structure-Adding (2) Dual Wall Mounter Level 2 Evcs. South Parking Structure-Adding (3) Dual Wall Mounted Level 2 Ecvs, Added (1) 75Kva Transformer And (1) 208V Electric Panel To Feed Chargers, Added (1) Van Accessible Ada Evcs Stall + (1) Ada Stall. Adding New Ada
- Status
- Prospective
- Sector
- Car parking, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial)
- Location
- Chula Vista, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Garage Building Level 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project Description: Project Title: **Scope Changed And Reduced - North Parking Structure Level 2 Evcs** T.I. Rohr Inc.: North Parking Structure-Adding (2) Dual Wall Mounter Level 2 Evcs. South Parking Structure-Adding (3) Dual Wall Mounted Level 2 Ecvs, Added (1) 75Kva Transformer And (1) 208V Electric Panel To Feed Chargers, Added (1) Van Accessible Ada Evcs Stall + (1) Ada Stall. Adding New Ada Path Of Travel To Existing Ada Path Of Travel. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Chula Vista |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
