Garber Road Channel Maintenance
Sector: Metal • Location: Broussard, Louisiana, United States of America
Source: Dodge USA
Scope - The work shall consist of the following: Removing approximately 8824 cy of spoil material from channel, importing approximately 6,080 cy of fill to rebuild channel, install 230 lf of 60 asphalt coated corrugated metal pipe, install 71 lf of 9 ft by 9 ft reinforced box culverts,and reconstructing approximately 257 lf of asphaltic roadway located in the City of Broussard.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Scope - The work shall consist of the following: Removing approximately 8824 cy of spoil material from channel, importing approximately 6,080 cy of fill to rebuild channel, install 230 lf of 60 asphalt coated corrugated metal pipe, install 71 lf of 9 ft by 9 ft reinforced box culverts,and reconstructing approximately 257 lf of asphaltic roadway located in the City of Broussard. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
