Garden St West Shared Use Path and Utility Impts REBID
Sector: Water Supply and Storage • Location: South Burlington, Vermont, United States of America
Source: Dodge
The City of South Burlington is requesting bids for shared use path and utility improvements along approximately 390-feet of Garden Street from the intersection with Dorset Street to the east. The project includes coarse milling, paving, curbing, pavement markings, signing, drainage, water main installation, shared use path installation, bridge railing, and other incidental items.
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Road, Bridge, Waste Processing and Treatment, Government, Rail, Power Transmission, Commercial, Power Generation (CCGT), Car parking, Automotive, Manufacturing (Industrial)
- Location
- South Burlington, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Garden St West Shared Use Path and Utility Impts REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of South Burlington is requesting bids for shared use path and utility improvements along approximately 390-feet of Garden Street from the intersection with Dorset Street to the east. The project includes coarse milling, paving, curbing, pavement markings, signing, drainage, water main installation, shared use path installation, bridge railing, and other incidental items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | South Burlington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Road, Bridge, Waste Processing and Treatment, Government, Rail, Power Transmission, Commercial, Power Generation (CCGT), Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
