logo

Gardner Proposed Data Center

Sector: Power Generation (CCGT) • Location: Gardner, Kansas, United States

Source: Johnson County Post

Project
Planned

Beale Infrastructure has proposed a 300-acre data center in eastern Gardner, near the northeast corner of 191st Street and South Clare Road. The facility would use a closed-loop, air-cooled system and is planned to be privately funded for electrical, roadway, and water infrastructure improvements. Initial operations would bring 50 full-time employees, with potential for expansion. The project incl

Status
Prospective
Sector
Power Generation (CCGT), Water Supply and Storage, Data Center, Road
Location
Gardner, Kansas, United States of America
Updated
22 Jul 2026
Source
Johnson County Post

ConstructChat

Ask ConstructChat about Gardner Proposed Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Gardner Proposed Data Center” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Gardner, Kansas, United States. Taiyo aggregates data on it from Johnson County Post.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Beale Infrastructure has proposed a 300-acre data center in eastern Gardner, near the northeast corner of 191st Street and South Clare Road. The facility would use a closed-loop, air-cooled system and is planned to be privately funded for electrical, roadway, and water infrastructure improvements. Initial operations would bring 50 full-time employees, with potential for expansion. The project includes sound mitigation measures and power supply from Evergy with private substations.

Original sector

Technology

Location

Country

United States of America (USA)

State

Kansas

City

Gardner

Source

Source

Johnson County Post

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Data Center, Road

Article published date

2026-05-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project