Garfield County RWD #5 Well No 3
Sector: Water Supply and Storage • Location: Bison, Oklahoma, United States of America
Source: Dodge
Construct new water well complete with all appurtenances for a fully operational system as shown in the plans and described in the specifications. Approximately 700' of 8" waterline extension class 200 PVC and all appurtenances. Concrete pads with generator and propane tank. Transfer switch. Electrical service pole with fuse disconnect. Graveling and fencing site. American Iron and Steel (AIS) req
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Cement, Metal, Steel, Government
- Location
- Bison, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Garfield County RWD #5 Well No 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construct new water well complete with all appurtenances for a fully operational system as shown in the plans and described in the specifications. Approximately 700' of 8" waterline extension class 200 PVC and all appurtenances. Concrete pads with generator and propane tank. Transfer switch. Electrical service pole with fuse disconnect. Graveling and fencing site. American Iron and Steel (AIS) requirements apply. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Bison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Cement, Metal, Steel, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
