logo

Garfield County RWD #5 Well No 3

Sector: Water Supply and Storage • Location: Bison, Oklahoma, United States of America

Source: Dodge

Project
Bidding

Construct new water well complete with all appurtenances for a fully operational system as shown in the plans and described in the specifications. Approximately 700' of 8" waterline extension class 200 PVC and all appurtenances. Concrete pads with generator and propane tank. Transfer switch. Electrical service pole with fuse disconnect. Graveling and fencing site. American Iron and Steel (AIS) req

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Cement, Metal, Steel, Government
Location
Bison, Oklahoma, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Garfield County RWD #5 Well No 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Garfield County RWD 5 Well No 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Bison, Oklahoma, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construct new water well complete with all appurtenances for a fully operational system as shown in the plans and described in the specifications. Approximately 700' of 8" waterline extension class 200 PVC and all appurtenances. Concrete pads with generator and propane tank. Transfer switch. Electrical service pole with fuse disconnect. Graveling and fencing site. American Iron and Steel (AIS) requirements apply.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oklahoma

City

Bison

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Cement, Metal, Steel, Government

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project