logo

Gariuai Mini-Hydropower Rehabilitation Project

Sector: Water Supply and Storage • Location: Timor-Leste

Source: Asian Development Bank (ADB)

Project
Proposed

In 2023, an initial assessment for rehabilitating the Gariuai Mini Hydroelectric Power Plant (MHPP) was conducted under ADB TA6813 TIM: Capacity Building of Electricidade de Timor-Leste in Distribution Network Operation and Maintenance by a Hydropower Specialist. This included a survey of the latest condition of the MHPP and the preparation of terms of reference for the rehabilitation.The proposed

Project Information FAQ

Project Information

5 Q
The project “Gariuai Mini-Hydropower Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Timor-Leste. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2023, an initial assessment for rehabilitating the Gariuai Mini Hydroelectric Power Plant (MHPP) was conducted under ADB TA6813 TIM: Capacity Building of Electricidade de Timor-Leste in Distribution Network Operation and Maintenance by a Hydropower Specialist. This included a survey of the latest condition of the MHPP and the preparation of terms of reference for the rehabilitation.The proposed project will conduct a detailed technical feasibility assessment of the MHPP and undertake the following (but not limited to) rehabilitation works, as needed: Hydrology studies and e-flows; Civil structural investigation and improvement, including the replacement of the penstock and anchor points; Hydromechanical and electromechanical components examination and replacement to ensure system efficiency and reliability; Replacement of power evacuation lines, protection equipment, supervisory control and data acquisition (SCADA) upgrades, automatic voltage regulator, and remote communication equipment; Detailed geological studies to assess landslide risks and propose mitigation measures.ADB will support EDTL in preparing and supervising the engineering design, construction, and subsequent operation and maintenance (O&M) of the rehabilitated power plant. The project will incorporate a capacity-building program for EDTL, ensuring knowledge transfer throughout project implementation to enable the sustainable operation of the plant after the O&M period expires, supporting the utility develop future hydropower projects. This project may include training in project design, management, administration, safety protocols, and O&M.Furthermore, the project will support an update of the 2011 Hydropower Master Plan, which was developed with Norwegian grant assistance and identified 14 economically viable hydropower projects, designed to generate power during both the dry and wet seasons. Given that the master plan was developed over a decade ago, an update is necessary to reassess project feasibility and align with the latest developments in Timor-Leste's power system and recent hydrology information.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data