Gariuai Mini-Hydropower Rehabilitation Project
Sector: Water Supply and Storage • Location: Timor-Leste
Source: Asian Development Bank (ADB)
In 2023, an initial assessment for rehabilitating the Gariuai Mini Hydroelectric Power Plant (MHPP) was conducted under ADB TA6813 TIM: Capacity Building of Electricidade de Timor-Leste in Distribution Network Operation and Maintenance by a Hydropower Specialist. This included a survey of the latest condition of the MHPP and the preparation of terms of reference for the rehabilitation.The proposed
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | proposed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In 2023, an initial assessment for rehabilitating the Gariuai Mini Hydroelectric Power Plant (MHPP) was conducted under ADB TA6813 TIM: Capacity Building of Electricidade de Timor-Leste in Distribution Network Operation and Maintenance by a Hydropower Specialist. This included a survey of the latest condition of the MHPP and the preparation of terms of reference for the rehabilitation.The proposed project will conduct a detailed technical feasibility assessment of the MHPP and undertake the following (but not limited to) rehabilitation works, as needed: Hydrology studies and e-flows; Civil structural investigation and improvement, including the replacement of the penstock and anchor points; Hydromechanical and electromechanical components examination and replacement to ensure system efficiency and reliability; Replacement of power evacuation lines, protection equipment, supervisory control and data acquisition (SCADA) upgrades, automatic voltage regulator, and remote communication equipment; Detailed geological studies to assess landslide risks and propose mitigation measures.ADB will support EDTL in preparing and supervising the engineering design, construction, and subsequent operation and maintenance (O&M) of the rehabilitated power plant. The project will incorporate a capacity-building program for EDTL, ensuring knowledge transfer throughout project implementation to enable the sustainable operation of the plant after the O&M period expires, supporting the utility develop future hydropower projects. This project may include training in project design, management, administration, safety protocols, and O&M.Furthermore, the project will support an update of the 2011 Hydropower Master Plan, which was developed with Norwegian grant assistance and identified 14 economically viable hydropower projects, designed to generate power during both the dry and wet seasons. Given that the master plan was developed over a decade ago, an update is necessary to reassess project feasibility and align with the latest developments in Timor-Leste's power system and recent hydrology information. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
