Garland (TX) Walmart Supercenter 3224-1008 SP
Sector: Power Generation (CCGT) • Location: Garland, Texas, United States of America
Source: Dodge USA
Remove Existing Walls And Security Grille As Indicated On Plans. Existing Perimeter Walls To Remain. Remove Existing Flooring And Transition Strips. Grind And Polish Slab. Install New Ceiling And Grid As Indicated On Plans. Remove Existing Lighting Install New Lighting Existing Hvac Diffusers And Grilles To Remain, Clean. Paint Interior Wall Finishes. Existing Electrical Wall Outlets To Remain On
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Garland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Garland (TX) Walmart Supercenter 3224-1008 SP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove Existing Walls And Security Grille As Indicated On Plans. Existing Perimeter Walls To Remain. Remove Existing Flooring And Transition Strips. Grind And Polish Slab. Install New Ceiling And Grid As Indicated On Plans. Remove Existing Lighting Install New Lighting Existing Hvac Diffusers And Grilles To Remain, Clean. Paint Interior Wall Finishes. Existing Electrical Wall Outlets To Remain On Partitions To Remain. Remove Interior Windows Infill Interior Windows |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Garland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
