Garrison Dam Spillway Anchor Testing Phase 2
Pre-design · North Dakota · Last reported Jan 2025
Source: Dodge
The goal of this project is to award a contract to conduct a Phase 2 investigation study of anchor bar installation to support on-going bar anchor evaluation and design for spillway anchorage in the Fort Union shale foundation. The Phase 2 information will be used to ensure the anchor production design is constructible, repeatable, and capable of resisting potential design loads. The Government wi
- Status
- Prospective
- Sector
- Hydro, Commercial, Manufacturing (Industrial), Water Supply and Storage, Government
- Location
- Riverdale, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Garrison Dam Spillway Anchor Testing Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The goal of this project is to award a contract to conduct a Phase 2 investigation study of anchor bar installation to support on-going bar anchor evaluation and design for spillway anchorage in the Fort Union shale foundation. The Phase 2 information will be used to ensure the anchor production design is constructible, repeatable, and capable of resisting potential design loads. The Government will provide program anchor design information and construction installation details. The Contracto... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Riverdale |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Commercial, Manufacturing (Industrial), Water Supply and Storage, Government |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- SR 55 @ CLARKS MILLPOND DAM
- I-90 Keechelus Dam to Stampede Pass Phase 2A
- I-90 Snowshed to Keechelus Dam Phase 1C
- BUSH FIELD - LOCK AND DAM ROAD
- SR 9 FM S OF BUFORD DAM RD TO PIRKLE FERRY RD
- Contract to revamp Anderson's Dam together with the Valley Water District, near two fault lines in Santa Clara County, California (United States)
- Intake works, construction of wells and conduction of the hydraulic circuit in the Chira and Soria dams, in Gran Canaria (Spain)
- CR 742/BASS ROAD FROM PROVIDENCE BLVD TO NEW FORSYTH ROAD
