logo
ProjectBid Results

Garrison Petawawa - General Maintenance

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

o supplement the maintenance being provided by DND personnel, the proposed maintenance contract will provide services for only some of the buildings on the base. The scope is to cover approximately 51 buildings at Garrison Petawawa with a gross floor area of 130,000 square meters initially. The potential exists for the gross floor area to increase to 165,000 square meters over the life of the cont

Status
Closed
Sector
Commercial, Car parking, Residential, Automotive, Manufacturing (Industrial)
Location
Petawawa, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Garrison Petawawa - General Maintenance

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Garrison Petawawa - General Maintenance” is an infrastructure initiative in the Commercial sector, located in Petawawa, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

o supplement the maintenance being provided by DND personnel, the proposed maintenance contract will provide services for only some of the buildings on the base. The scope is to cover approximately 51 buildings at Garrison Petawawa with a gross floor area of 130,000 square meters initially. The potential exists for the gross floor area to increase to 165,000 square meters over the life of the contract as new infrastructure comes online. In addition to buildings, there is an airfield, parking ...

Procurement method

Location

Country

Canada

State

Ontario

City

Petawawa

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Car parking, Residential, Automotive, Manufacturing (Industrial)

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project