logo
ProjectClosed

Garrison Riverdale Feeder Relocation

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Scope of work : The purpose of this project is to relocate the Riverdale electrical power feed from the current connection to the Garrison power plant outside station service switchgear to a connection in the Garrison Transmission Switchyard. Relocating the line is an extensive effort that requires the purchase and installation of terminal equipment, overhead and underground cabling, and distribut

Status
Closed
Sector
Telecommunications, Commercial, Power Transmission, Power Generation (CCGT)
Location
Coleharbor, North Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Garrison Riverdale Feeder Relocation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Garrison Riverdale Feeder Relocation” is an infrastructure initiative in the Telecommunications sector, located in Coleharbor, North Dakota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope of work : The purpose of this project is to relocate the Riverdale electrical power feed from the current connection to the Garrison power plant outside station service switchgear to a connection in the Garrison Transmission Switchyard. Relocating the line is an extensive effort that requires the purchase and installation of terminal equipment, overhead and underground cabling, and distribution poles. The new connection for Riverdale will be to the secondary side of the 115kV/13.8kV 10M...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Coleharbor

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Telecommunications, Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project