Garrison Riverdale Feeder Relocation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Scope of work : The purpose of this project is to relocate the Riverdale electrical power feed from the current connection to the Garrison power plant outside station service switchgear to a connection in the Garrison Transmission Switchyard. Relocating the line is an extensive effort that requires the purchase and installation of terminal equipment, overhead and underground cabling, and distribut
- Status
- Closed
- Sector
- Telecommunications, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Coleharbor, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Garrison Riverdale Feeder Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work : The purpose of this project is to relocate the Riverdale electrical power feed from the current connection to the Garrison power plant outside station service switchgear to a connection in the Garrison Transmission Switchyard. Relocating the line is an extensive effort that requires the purchase and installation of terminal equipment, overhead and underground cabling, and distribution poles. The new connection for Riverdale will be to the secondary side of the 115kV/13.8kV 10M... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Coleharbor |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE