logo
ProjectConsented

Gartenwall 11kV Deviation, Gartocharn

Sector: Hydro • Location: United Kingdom

Scottish Hydro-Electric Power Distribution (SHEPD) is looking to replace a defective pole-mounted transformer pole within the garden area of Gartenwall, Gartocharn, Alexandria. A more practical solution is to deviate the overhead line and move the pole position to the edge of the adjacent field. The proposal is to take a connection from our existing 11kV overhead line at Pole 62. A new 11kV ove

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Automotive, Government, Road
Location
United Kingdom
Updated
19 Nov 2026
Source
Scottish Government Energy Consents Unit

ConstructChat

Ask ConstructChat about Gartenwall 11kV Deviation, Gartocharn

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Gartenwall 11kV Deviation, Gartocharn” is an infrastructure initiative in the Hydro sector, located in United Kingdom. Taiyo aggregates data on it from Scottish Government Energy Consents Unit.

Participants

Not available for this record.

Status

Original status

consented

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Scottish Hydro-Electric Power Distribution (SHEPD) is looking to replace a defective pole-mounted transformer pole within the garden area of Gartenwall, Gartocharn, Alexandria. A more practical solution is to deviate the overhead line and move the pole position to the edge of the adjacent field. The proposal is to take a connection from our existing 11kV overhead line at Pole 62. A new 11kV overhead line is to be erected from Pole 62 consisting of 2 single poles numbered 1 & 1A and this will connect onto existing Pole 2. The pole-mounted transformer is to be installed on new pole 1A and a short section of low voltage underground cable laid to connect onto the existing low voltage network. All works will be carried out under approved SHEPD methods for overhead line construction and will take 2 days to complete. All vehicles are to utilise existing access roads, tracks & terrain. There are no associated traffic management requirements.

Original sector

Overhead Power Line

Location

Country

United Kingdom (UK)

Source

Source

Scottish Government Energy Consents Unit

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Automotive, Government, Road

Article published date

2026-11-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project