Garth Road Reconstruction Phases C D & E
Sector: Power Transmission • Location: Baytown, Texas, United States of America
Source: Dodge
Garth Road from Archer Road to south of Baker Road: Reconstruction and widening from four to six lanes from I-10 to Baker Road, with upgraded utilities. Sidewalk along both sides of Garth, Center medians with turn lanes, Landscaping within the center medians, Dedicated deceleration lanes.
- Status
- Prospective
- Sector
- Power Transmission, Government, Road, Cable car, Automotive, Power Generation (CCGT), Telecommunications, Car parking, Commercial
- Location
- Baytown, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Garth Road Reconstruction Phases C D & E
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Garth Road from Archer Road to south of Baker Road: Reconstruction and widening from four to six lanes from I-10 to Baker Road, with upgraded utilities. Sidewalk along both sides of Garth, Center medians with turn lanes, Landscaping within the center medians, Dedicated deceleration lanes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Baytown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Government, Road, Cable car, Automotive, Power Generation (CCGT), Telecommunications, Car parking, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
