GAS 458 Park DR
Sector: Water Supply and Storage • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Replacement of two natural gas hot water tanks with natural gas tankless units Relocation of natural gas for gas range in kitchen Repiping of existing gas fireplaces Placement of gas stump for future supply to outdoor elevated deck
- Status
- Prospective
- Sector
- Water Supply and Storage, Natural Gas, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about GAS 458 Park DR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacement of two natural gas hot water tanks with natural gas tankless units Relocation of natural gas for gas range in kitchen Repiping of existing gas fireplaces Placement of gas stump for future supply to outdoor elevated deck |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Natural Gas, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
