GAS 51 Sleeper ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Provide new gas main from new meter (By Gas Company) on the exterior of the building at level 1 to (2) 2000 MBH Gas Boilers on the 8th floor.New Pipe routing will be throught the building to the roof, across the roof and back down to 8th floor mechanical room. 8th floor is the top floor of the building
- Status
- Prospective
- Sector
- Commercial, Government, Manufacturing (Industrial)
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about GAS 51 Sleeper ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Provide new gas main from new meter (By Gas Company) on the exterior of the building at level 1 to (2) 2000 MBH Gas Boilers on the 8th floor.New Pipe routing will be throught the building to the roof, across the roof and back down to 8th floor mechanical room. 8th floor is the top floor of the building |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
