GAS 61-63 Berkeley ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Replace old corroded venting on two boilers per manufactures specs.on the two upper floors.Then remove and replace old first floor boiler that was not to manufactures specs.(vent was to far for any proper material to repair).Boiler to be replaced with new Navien hot water and heating unit.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about GAS 61-63 Berkeley ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace old corroded venting on two boilers per manufactures specs.on the two upper floors.Then remove and replace old first floor boiler that was not to manufactures specs.(vent was to far for any proper material to repair).Boiler to be replaced with new Navien hot water and heating unit. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
