logo

GAS DEVELOPMENT II

Sector: Water Supply and Storage • Location: Bangladesh

Source: World Bank Group

Project
Closed

TThe Second Gas Development Project's objectives are to support Petrobangla's efforts to: (i) expand gas supplies in line with incremental demand expected over the medium term and produce the country's first significant quantities of condensate available from the gas fields of Kailashtila and Beani Bazar; (ii) initiate an appraisal program of the main gas fields to provide a preliminary basis for

Project Information FAQ

Project Information

5 Q
The project “GAS DEVELOPMENT II” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

TThe Second Gas Development Project's objectives are to support Petrobangla's efforts to: (i) expand gas supplies in line with incremental demand expected over the medium term and produce the country's first significant quantities of condensate available from the gas fields of Kailashtila and Beani Bazar; (ii) initiate an appraisal program of the main gas fields to provide a preliminary basis for their long-term development; and (iii) strengthen its management capability, particularly in the areas of field management and production planning. The project will consist of: (a) a gas field appraisal and development component that will comprise the drilling of nine wells, the workover of two existing wells, and a reservoir study for each producing field; (b) a gas infrastructure component to bring the gas fields of Kailashtila, Beani Bazar, and Rashidpur into production, involving the construction of an approximately 117-mile long gas pipeline with the necessary gas and condensate treatment facilities; and (c) pilot CNG applications; and (d) training and technical assistance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data