GAS DEVT
Sector: Road • Location: Bangladesh
Source: World Bank Group
The project would be implemented over a three-year development period (FY81-FY83) and would include: the drilling of four wells and the recompletion of an existing well; the provision of the necessary gas gathering and conditioning facilities; the construction of a 24" gas transmission pipeline, 110 miles in length, from Bakhrabad to the city gate station in Chittagong; the construction of a 20"/1
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project would be implemented over a three-year development period (FY81-FY83) and would include: the drilling of four wells and the recompletion of an existing well; the provision of the necessary gas gathering and conditioning facilities; the construction of a 24" gas transmission pipeline, 110 miles in length, from Bakhrabad to the city gate station in Chittagong; the construction of a 20"/16" gas distribution system supplying the major consumers in Chittagong; the construction of a 10" gas spur line to the Karnafuli Paper Mill and supplying industrial estates en route; the provision of ancillary maintenance, administration and communications facilities; the provision of advisory services for project implementation and studies; the provision of training; and, the provision of technical assistance and studies to assist in development of Bangladesh's energy resources, including a pilot project to test utilization of compressed natural gas (CNG) as an automotive fuel. The project would assist Bangladesh in reducing its present over-dependence on imported oil and petroleum products through the replacement of liquid hydrocarbons with indigenous natural gas and would make available the use of gas as a feedback for fertilizer production. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
