logo
ProjectPlanned

Gas Hills Uranium Project

One of 8,596 projects Taiyo tracks in Wyoming.

Source: Crux Investor

The Gas Hills Project in Wyoming is 100% company-owned with initial capital costs of $55.2 million USD, a pre-tax IRR of 54.8% at $87/lb long-term uranium price, a post-tax IRR of 50.2%, an 11-year mine life, and annual production of 880,000 lbs. Entry into the production pipeline is proposed for 2028.

Status
Prospective
Sector
Nuclear
Location
Wyoming, United States of America
Updated
22 Jul 2026
Source
Crux Investor

ConstructChat

Ask ConstructChat about Gas Hills Uranium Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Gas Hills Uranium Project” is an infrastructure initiative in the Nuclear sector, located in Wyoming, United States. Taiyo aggregates data on it from Crux Investor.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Gas Hills Project in Wyoming is 100% company-owned with initial capital costs of $55.2 million USD, a pre-tax IRR of 54.8% at $87/lb long-term uranium price, a post-tax IRR of 50.2%, an 11-year mine life, and annual production of 880,000 lbs. Entry into the production pipeline is proposed for 2028.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Wyoming

Source

Source

Crux Investor

URL

More Details

Record type

Project

Sector

Nuclear

Article published date

2026-03-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project